https://www.instagram.com/p/C23tbUlAmGb/?hl=en
top of page
Search

How long does it take to renovate a new kitchen?

The time required to remodel a kitchen can vary significantly based on several factors, including the scope of the project, the size of the kitchen, the complexity of the design, and the availability of materials and labor. Here's a general guideline for different levels of kitchen remodeling projects:

  1. Cosmetic Updates: If you're making minor cosmetic updates like painting, changing cabinet hardware, and upgrading appliances, you can typically complete the project in a week or less.

  2. Basic Renovation: A basic kitchen renovation, which includes replacing cabinets, countertops, sinks, and appliances, usually takes around 2 to 4 weeks.

  3. Mid-Range Remodel: For a mid-range remodel involving custom cabinets, new flooring, lighting, and some plumbing or electrical work, you can expect the project to take approximately 4 to 6 weeks.

  4. Major Overhaul: A major kitchen overhaul, which may include structural changes, such as removing walls or reconfiguring the layout, as well as high-end finishes, can take 6-10 weeks or more.


2 views0 comments

Recent Posts

See All

Comments


Post: Blog2_Post
bottom of page